Martorell-Figueres Gas Pipeline

  • Construction company: UTE MARTORELL GAS – ACSDragadosCopisa
  • Construction year: 2012
  • Work carried out by GRUPO COPUNO: Installation of the gas pipeline power evacuation line, which has a length of 270 kilometers and a voltage of 400 kilovolts.
  • Location: Barcelona
  • Other relevant information:

– Gas pipeline length: 270 kilometers

– Excavation of the gas pipeline using the drill and blast method

– Lining of the pipeline with steel pipe

– Installation of safety systems