Rialp Pumping Station

  • Construction company: UTE FCC-Comapa
  • Construction year: 2003
  • Work carried out by GRUPO COPUNO: Our staff has achieved the construction of the pumping room and the loading system by installing the main supply pipe of the Segarra-Garrigues canal. The station is equiped with 8 pumps and pipes of 3000 mm of diameter. Our staff also completed all the formworks and built the station enclosure.
  • Location: Rialp (Lleida)
  • Other relevant information:

– Structural concrete poured

– Concrete poured for the realization of cable channels

– Formwork of double-sided walls

– Formwork of single-sided walls

– Formwork of concrete manhole covers

– Installation of hydro-expansive joint

– Installation of DYWIDAG anchorages

– Laying and painting of PVC plates for walls waterproofing

– Renewal of reinforcement steel bars in the caisson area

– Welding

– Construction of 10 cm thick walls

– Walls face lifting

– Laying of terrazzo

– Erection and dismantling of scaffolding

– Laying of drainage pipes including the laying of geotextile and a layer of gravel

– Formwork for Howell-Bunger valve installation