The new C-12 road includes several viaducts for which achievement our staff participated. We also carried out works on electrical conduits, and sanitation works and others.
1 928.69 m3 of concrete pouring and leveling in strip foundations
6 160.00 m3 of concrete pouring and vibrating in backfillings
8 162.00 m3 Pouring, vibrating and curing of concrete in foundations and strip foundations
6 164.23 m3 Casting, vibrating and curing of concrete for walls
7 213.50 m2 Formwork for foundations
9 381.00 m2 Formwork of high walls (over 8 m high)