For the construction of Lleida-Alguaire airport, our staff has carried out the construction of the airplane platforms, drainages , rain water networks, electrical networks, urbanizations and a parking for vehicles.
6500.00 m2 Vertical and horizontal waterproofing with bitumen emulsion
4200.00 m2 Vertical waterproofing with geotextile
3100.00 m3 Pouring of 10 cm blinding concrete layer
1250.00 m2 Construction of concrete blocks walls
10,200.00 m3 Walls formwork
15,047.00 m2 Surface finishing of concrete slab sides
77078.26 ml. Installation of fluorescent markers
42000.00 ml. Laying of PVC slats